HDB BTO Renovation Package (Standard)
3-room BTO renovation package: $16,999 (w. GST)
4-Room BTO renovation package $19,999 (w. GST)
5-room BTO renovation package $21,399 (w. GST)
*** All prices are inclusive of GST
A. Professional Service
Design concept consultation
Space planning & Layout plan proposal
Designer's 3D computerized drawing
Material and colour scheme proposal
Project management & site supervision
B. Masonry Works
Supply & lay 600x 600mm homogeneous floor tiles with skirting at living room
Supply & lay 600x 600mm homogeneous floor tiles with skirting at dining room
Supply & lay pre-pack cement 2-1 screening for all bedroom
To supply and lay 3mm vinyl floor at all bedroom floor area c/w skirting finish (free upgrade to 5mm)
Supply & lay construct main entrance door kerb with tiles finish
Construct 50 mm ht kitchen cabinet base with tiles skirting
C. Plumbing Works
Supply & install 2"pvc outlet pipe for kitchen sink
Supply labours to install kitchen sink
Supply labours to install kitchen sink tap
Supply labours to install instant heater x 2 or tank heater x 1
Supply labours to install 2 x toilet accessories
D. Painting Works
Supply labours & material to paint whole house internal wall using Vinlex 5000
Supply labours & material to paint whole house internal ceiling using matex paint 4+1
Supply labours & material to paint all room door & frame with pipe (if any )
E. Carpentry Works
To supply and install upper and low storage cabinet with selected laminate finish c/w ABS Trimming and solid ply wood 20ft ( Internal colour pvc finish ).
1 unit cutlery tray
glass panel door x 1
selected drawers c/w metal runner x 3 soft close
Selected soft close hinges
dish rack x 1
run cooker hood points
labour to install cooker + hood
To supply and install selected 20mm quartz work top 10ft with 50mm backsplash
F. Miscellaneous
Haulage service & Debris removal fee
General Washing & Chemical washing upon completion
To supply and lay protection at existing new floor area
FOC Items
Mayer Hood ( MMS1900HS Sum Hood )
Mayer Cooker MMSH772H or MMGH773H
Kitchen Sink E600 Single Bowl Top Mount Sink (600 x 500 x 240mm )
or E880 Double bowl top mount sink ( 880 x 480 x180mm )
Kitchen sink tap E+NT 4915
a) Mitsubishi Electric Sys 3-1 MXY3A28VA, MSYGE10VA x 3 ( Top-up cost $1,888 only )
b) Mitsubishi Electric Sys 2-1 ( Top up cost $1,388 only )
Our HDB BTO Renovation Projects
Factors That Affect BTO HDB Renovation Costs
There are many factors affecting the costs of renovation. The key factors to look out for would be the following.
The size and type of your property, such as condo and landed property.
The type and extent of the amount of work required.
The renovation company in Singapore that you would be hiring for the renovation.
Your property’s status on being brand new or resale.
The materials you would like to use.
How do you choose the best HDB BTO renovation package?
It is not that you would know the exact things you should be getting at all times when it comes to renovating your home. Some clients might find be confused about exactly which interior design packages to select. For instance, which 2-room, 4-room, or 5-room HDB renovation package to choose. It will be of good use if you know how to choose at the beginning before consulting us. Fret not; we will be here to provide any form of help and guidance. But, if you would like to have a head start, you may check out the different renovation packages on our page.
Tips for anyone planning HDB BTO renovations
1. Seek financial advice to prevent renovation fails
Setting a strict budget for the whole renovation process is essential, apart from choosing which renovation package is best suited for you. One of the critical reasons for failures would be unexpected expenses. In the event the budget is exceeded, it can cause harm to the entire BTO package. In worse-case scenarios, the whole project falls apart. This can be avoided very easily by seeking financial advice from professionals.
2. Plan ahead
It is simple logic that the more time you have, the less chaotic it will be for you.
You can prevent your targeted completion date from exceeding by having a well-thought-out plan. In other words, you may start planning right after you have a floor plan. Despite the company's reputation, you’re contracting for the job, and rushing your home renovations can still affect the quality.
Frequently Asked Questions
What is included in the BTO Standard Renovation Package?
Our BTO Standard Renovation Package includes comprehensive services such as:
Kitchen renovation: Custom cabinetry, countertops, tiling, and plumbing.
Bathroom renovation: Installation of fixtures, tiles, waterproofing, and plumbing.
Flooring: Options like vinyl, laminate, or tiles for living areas, bedrooms, and kitchens.
Carpentry: Custom-built wardrobes, storage solutions, and shelving.
Electrical work: Installation of lighting, electrical points, and switches.
Painting: Full interior painting of walls and ceilings.
Is the BTO renovation package customisable?
Yes, our BTO renovation package is fully customisable where you can tailor the package to meet your specific requirements, whether you want to upgrade your kitchen, add more carpentry work, or select premium materials for certain areas.
How long do BTO renovation projects take?
Generally, BTO renovation in Singapore should take around 6 to 8 weeks. Do take note that every BTO renovation is unique and different. Hence, the timeline of the renovation project depends on how much work you would like to be completed.
Would renovations increase the value of my HDB?
It depends. Renovating your house will only increase the selling price only if potential buyers like them and would like to keep them. Hence, it depends on the preferences of your buyers.
Are your BTO renovations HDB-compliant?
Yes, all our BTO renovation works are fully HDB-compliant. We ensure that all renovation activities follow HDB’s rules and regulations, including structural changes, electrical work, and plumbing installations.
Do I need to get approval from HDB for the renovation?
For most renovations in BTO flats, approval from the Housing and Development Board, Singapore is required, especially for works that involve hacking, plumbing, or electrical work. Our team assists in managing the approval process to ensure a smooth and hassle-free experience.
Can I live in my BTO flat during the renovation?
Although it is possible to live in your flat during minor renovations, we recommend that for larger renovation projects, you arrange some temporary accommodation so that you will not be disturbed by the renovation noise, dust, and general inconvenience.
Do you provide design consultation as part of the package?
Yes, our renovation package includes free interior design consultation. Our team will work with you to understand your style preferences, functional needs, and budget to create a design plan that reflects your vision for your BTO flat.
Free Consultation For AC Vision Renovation Packages
AC Vision provides free consultation for HDB BTO standard and other interior design packages for homeowners seeking renovation in Singapore. We are more than happy to give free consultation. You can get them by contacting us and sharing your ideas and plans today.
Free Quotation
Get a non-obligatory consultation with Our experienced interior designers! Start planning for your home renovation today.